top of page

CHINALCO MINE

Junin, Peru

Minera Chinalco Perú S.A.

Dec 2023

As-Built Plans

Project Overview

DCMS carried out a 10,093-hectare photogrammetric survey of the Chinalco Mining Complex in Junín, Peru, to support infrastructure optimization, storage analysis, and logistics planning. Our goal was to generate accurate terrain models that would inform road system updates, asset mapping, and material flow distribution, ultimately boosting operational efficiency.

Deliverables

High-Resolution Orthophotos :Accurate, large-scale geospatial data

Digital Terrain Model (DTM): Supporting cut-and-fill volume estimates

Geospatial Mapping of Infrastructure: Roads, platforms, deposits, and working areas

2D & 3D Outputs: Compatible with GIS and engineering platforms

fireframe_edited.jpg
fireframe_edited.jpg

Our Role & Technology

DCMS deployed RTK drones and photogrammetric software to collect and process thousands of images across the mining site. The final deliverables provided accurate visual and analytical documentation to optimize internal transportation, layout planning, and future construction. Tools Used::

Photogrammetric survey for mining infrastructure optimization using DJI M300 RTK drone,

Agisoft Metashape for 3D reconstruction,

QGIS and AutoCAD Civil 3D.

Key Challenges & Solutions

Optimized access and circulation through improved internal roads

Accurate mapping of assets and site infrastructure

Strategic layout planning to support operations and future expansion

OUR WORKFLOW:Scan, Process,
3D Modeling and Deliver

Power Your Project with Precision

Get reliable LiDAR data, 3D scans, and as-built documentation to move forward with accuracy and confidence.

Talk to a Specialist – Available Every Day, Anytime

Trusted by Leading Brands and Industry Leaders

bottom of page